191 MLD DESALINATION PLANT, OMAN

Category
Municipal Industry
About This Project

This prestigious project was executed by Wabag on a SPV concept. Wabag jointly with partners delivered the project. In this project, WES (IEC) engineers actively participated in the Detailed Engineering of the project. Project scheme was Sea Water intake system (from 1.6Km inside of sea), Pre- treatment section which consisted of Dissolved Air Flotation, Dual Media Filter, Cartridge Filter, Reverse Osmosis System, Product water System, Remineralisation System, Effluent Treatment System etc. Pre-treatment section consists of 52 Dual media filter which was arranged in a zig zag manner due to space constraints. Reverse osmosis skid capacity was 27 MLD per skid and there were total 8 skids. This project was executed on a fast track basis.